ARC Request Form

ARC Request Form

Towne Lake Homeowner’s Association Request for Project Approval

Homeowners must complete all fields in this form before it will be considered by the ARC.

It is preferred that you submit this form online so that all members of the ARC will receive it and it will be considered more quickly.

If you do not wish to complete this form online, you can download a PDF version by clicking the link below:

    Owner Name:

    Email:

    Property Address (number & street):

    Mailing Address (if different than above):

    Preferred Phone:

    Alternate Phone:

    Contractor(s):

    Estimated Start Date:

    Esimated Completion Date:

    Homeowner Request

    Make sure you described the proposed property changes in detail above. Include/upload a sketch, drawing or a photo showing dimension, location and relevant features as well as information on style, materials and colors. For painting and reroofing, include samples or provide sufficient detail to ensure covenant compliance. If additional information is required, the request will be deferred until it is received by the ARC.

    (max file size: 5MB)

    I agree to the stipulations & understand the other info below.

    [anr_nocaptcha g-recaptcha-response]

    Stipulations of ARC Request:

    As a homeowner, I agree and stipulate to the following by submitting this request for approval by the ARC:

    1. Homeowner understands and agrees no work in this request shall commence until written approval from the ARC is received.
    2. Construction/work must meet all Federal, State, County and City zoning, building code and laws.  Nothing herein contained shall be construed as a waiver or modification of any such code or law.  Homeowner will obtain and forward a copy of any building permit required by the City prior to commencing construction work.  If a permit is required, this approval is NOT effective until a copy is received by the ARC.
    3. Homeowner and contractors are expected to comply with all Towne Lake covenants, including those covering parking (trailers, dumpsters, etc.), signs and trash.  If necessary, the homeowner may request a temporary, short-term deviation by including such request in this form or by submitting a separate written advance request.
    4. Homeowner shall require contractors to clean the job site at the end of the workday and is responsible to ensure property used to gain access to the project site is left in the same condition as it was when the property was first accessed.
    5. Homeowner agrees that work must be done in a manner so it does not unreasonably interfere with neighboring properties and/or owners and assumes full responsibility for any and all damages caused by contractors occurring to adjoining property including, but not limited to, ground cover, shrubs, trees, landscaping, sidewalks, curbs, streets, lights, and Towne Lake common areas. 

    Other Information:

    1. The City of Montgomery Sanitation Department will not pick up building debris and requires all contractors, including landscaping contractors, to remove all residue and rubbish resulting from their work.
    2. Where applicable, utility easements are to be marked before excavation is started. This service is provided free of charge by Alabama Utility and is required to provide for safety when installing a fence, driveway or landscaping.  For location of underground telephone, cable TV, electric, gas, water, and sewer lines, call the Alabama line location center at (800) 292-8525 at least 48 hours and no earlier than 2.5 weeks prior to starting work.  Note: there is a fine if underground cables are severed.
    3. For information regarding zoning call Planning Controls at (334) 241-2722 and for construction (building permits) call (334) 241-2072.  Applications for building permits are available on the City of Montgomery website.